UPGRADING CONTROL SYSTEM S7-300 QC01, QC02 BEN NGHE PORT

Project Name:  Upgrading control system S7-300 QC01, QC02

Customer: Ben Nghe Port

Beginning time:

Ending time:

Overview:

Through a long working time with old control system S5 Siemens.  Two cranes QC01 and QC02 port appears unstable and damaged status, causing difficulties in the work of repair and maintenance, thus affecting productivity of port operations. So Ben Nghe port has partnered with UNICO VINA JSC, is a company with high professional competence and long experience in the crane industry, performing upgrades system scheme for QC01 and QC02.

I. The Scope Of Supply

  1. Converting program from PLC S5 system, bloated to a compact Siemens S7-300 system.
  2. Providing specialized software package from Siemens for programming and monitoring system.
  3. Creating new SCADA Simatic WinCC SCADA system of Siemens.
  4. Installing Profibus-DP and Profinet network.
  5. Provide manual programming software, system diagnostics, basic commands in the program and other operations for the service and maintenance diagnostics.

II. Some Picture Of The Project

  1. Profibus-ProfiNET network system PLC S7-300.

1

2. Electric-PLC stations.

2

5

3. CMS System

6

7

8

9

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Project’s benefit:

The S7-300 PLC system with the high reliability, precise control response and stability.

The monitoring system interact with SCADA screen: The screen monitor support for monitoring crane operations and displays accurate fault diagnostic, help the repair and quick maintenance.