ABI Binh Duong Project.
Investor: AB InBev Vietnam
Begin: 07/07/2014
Time to execute the work: 6 months
UNICO VINA Scope:
- Unloading and Install Piping and Equipment for CCT, BBT, Filtration, CIP, Yeast, Water Treatment Plan, CO2, Ammonia, Cooling and Air Compressor.
- Install Electric Cabinet, Electric Equipment, Pulling and Connect Cable.
- I/O Test.
- Design, Fabrication and Installation for Main Piping Bridge.
- Design, Fabrication and Installation for Platform in Filling Line.
—————
Water Treatment Plan: Pictures onsite:
Piping System in WTP Area, material: Hygienic Pipe, Welding Procedure: TIG (UVN-TIG-01).
Pump and Valve system in WTP.
RO System.
Chemical tanks, PVC Piping, Heated method is used for piping welding.
Finish installation, WTP ready for handover.