ABI BINHDUONG Project

ABI Binh Duong Project.

Investor: AB InBev Vietnam

Begin: 07/07/2014

Time to execute the work: 6 months

UNICO VINA Scope:

  • Unloading and Install Piping and Equipment for CCT, BBT, Filtration, CIP, Yeast, Water Treatment Plan, CO2, Ammonia, Cooling and Air Compressor.
  • Install Electric Cabinet, Electric Equipment, Pulling and Connect Cable.
  • I/O Test.
  • Design, Fabrication and Installation for Main Piping Bridge.
  • Design, Fabrication and Installation for Platform in Filling Line.

—————

Water Treatment Plan: Pictures onsite:

image001

Piping System in WTP Area, material: Hygienic Pipe, Welding Procedure: TIG (UVN-TIG-01).

image003

Pump and Valve system in WTP.

image006

RO System.

image004

Chemical tanks, PVC Piping, Heated method is used for piping welding.

image008

Finish installation, WTP ready for handover.